Home > Reference List > IGLESIAS

IGLESIAS

RENOVO BIOENERGY

CountryItaly
Year of construction2014

The system consists of a hot gas generator, connected to a thermal oil boiler for heating the oil required to operate a 999KWe ORC turbine. Excess heat is recovered in internal production processes.

ProductionElectric energy
Total heat6 MW
Thermal oil5.5 MW
FuelVirgin wood biomass
Grate Dimensions10 m2